Main Technical Indicators
1.1 Fuselage
1.1.1 Airframe accuracy correction: 21 accuracy corrections
1.1.2. XYZ measurement stroke: 300 * 200 * 200mm
1.1.3 Overall dimensions L * W * H: 1350 * 800 * 1700mm
1.1.4. Host weight: 280Kg
1.1.5. Maximum bearing capacity of the machine: 30KG
1.1.6 Z-axis control mode: keyboard, mouse, control box
1.1.7. XY axis measurement accuracy: 2.5+L/200 μ m
1.1.8 Repetitive accuracy: 2 μ m
1.1.9 Machine: Grade 00 granite
1.1.10 Z-axis column: Grade 00 granite
1.1.11. Z-axis ball screw: grinding grade
1.1.12. X and Y axis locking device with toothless light rod: fine adjustment and fast movement
1.1.13. Three axis guide rail: grinding level
1.2. Electric control system
1.2.1 Protection: overload and leakage protection, emergency stop switch
1.2.2. Wiring method: integrated bus
1.2.3. Calculation system: refer to the specific configuration at the current stage; 23.8 High Definition Display
1.3 Lens
1.3.1 Lens: Automatic zoom telecentric external lens, objective magnification 0.7-4.5X (electric zoom)
1.3.2. Automatic zoom positioning: 1 μ M circular glass grating
1.3.3 Automatic focusing: curve indication
1.3.4 Optical magnification: 30-130 times
1.3.5 Camera: 1.3 million digital industrial high-definition gigabit network camera
1.4 Light source system
1.4.1 Upper light source: 4-ring 8-zone LED cold light source with independent program control for each section, 256 level brightness adjustable surface light
1.4.2 Lower light source: 256 level brightness adjustable collimated parallel light
1.4.3 Coaxial light: 256 level brightness adjustable triangular refraction coaxial light
1.5. Control transmission system
1.5.1 Motor: closed-loop servo motor
1.5.2 Grating ruler: 0.01 μ M absolute grating ruler
1.5.3 Control board: AR3 network board gigabit transmission, network interface motherboard Z-axis with brake system
1.6 Software System
1.6.1 Manual measurement: points, lines, circles, arcs, ellipses, keyways
1.6.2 Automatic measurement: automatic line, automatic circle, multi segment automatic circle, automatic arc, automatic multi segment ellipse
1.6.3 Automatic recognition measurement: automatic line recognition, automatic circle recognition, automatic arc recognition, point selection circle.
1.6.4 Box selection measurement: Box selection of lines, circles, arcs, ellipses
1.6.5. Automatic fitting construction: points, lines, circles
1.6.6. Annotation function: distance, radius, diameter, coordinate points, text description, and editing.
1.6.7 Coordinate system: multi coordinate switching
1.6.8 Multiplication correction: automatic
1.6.9 File input format: DXF
1.6.10. Report output: Word, Excel, PDF, DXF, IGES
1.6.11 Quality Analysis Report: SPC
1.6.12. Special function: boundary tracking scanning
1.7. Warranty: 12 months
1.8. After sales
After receiving the user's repair request, immediately communicate and guide the solution by phone. If the problem cannot be solved by phone, provide a solution within two hours and arrive at the customer's site within 24 hours to solve the problem. (excluding national statutory rest days)
Download Datasheet
You must be logged in to post a review.
Reviews
There are no reviews yet.